Note: The showroom is temporarily closed due to busy times. Pickup orders remain available, please schedule a pickup time.
€ 1.199,00
Price for installation in the Netherlands applies with accessible cabling and a cable length of up to 10 meters, without digging between the meter box and the installation.
For every additional 10 meters, 5 meters are added due to cable loss in the box and during installation (2-4 meters of cable).
Additional work will be billed on an after-the-fact basis.
In stock
The installation price is based on a standard installation. This assumes an easily accessible cable route between the meter box and the Sigenergy home battery, with a maximum cable length of 10 meters. The meter box must be technically suitable for the installation.
All standard small installation supplies needed for the installation, such as pipes, cable fasteners, clamps, and connection materials.
Travel expenses are not included in the installation price and will be billed separately afterward.
The installation price is based on the information provided in advance by the customer and the terms and conditions listed above. If, during installation, it becomes apparent that additional work or materials are necessary, this will be considered additional work. This will always be done in consultation with the customer and with full transparency regarding the work and any additional costs.
Any additional work will be discussed with the customer in advance and carried out only after approval has been given.
The entire installation is handled by Off Grid Power Station’s experienced and certified installation partners.
Your discount code will be sent to you by email and can be used during the pre-sale from July 15 through August 15.